April 12, 2009

Finished preparing bulkheads.

Category: Bulkheads — Steffen @ 21:16 — Hours: 3

As the title says, I finished preparing the bulkhead parts for primer today. I didn’t have much left to do, the first I did was smoothen the edges and flute the F-710 bulkhead.
bulkheads-113-400x

Then I fabricated the support angle that gets riveted to the top of this bulkhead…
bulkheads-114-400x

…and matchdrilled it to the bulkhead.
bulkheads-115-400x

Finally I prepared the very aft bulkhead, the F-712 bulkhead. The vertical stabilizer bolts onto the rear of this bulkhead, so it get riveted together with flush rivets. I countersunk the holes in the aft bulkhead part for these rivets.
bulkheads-116-400x

I spent some more time finetuning the various parts, so now I’m ready for a priming mission. Tomorrow should be a good day for it!! 🙂