February 15, 2008

Priming elevator parts

Category: Elevators (Total 38h) — Steffen @ 19:29 — Hours: 6.5

I had the day off today, since I have been working a lot of hours in sweden this week. I took the opportunity to get the elevator parts primed. First I spent a couple of hours matchdrilling the left elevator and getting the rest of the parts deburred. Then I took all the parts with me to work and primed it all.

elevators-024-400×300.jpg

I still need to prepare and prime the trim tab and brackets, but I will wait with that until after I have riveted the elevators.

Hacked by ghost-dz