May 4, 2015

Working my way back to building – continued.

Category: New workshop — Steffen @ 22:44 — Hours:

After the floors were finished, it was time to rebuild the walls. Some of them were to have sliding doors, those took a little more time to build.
Hestehaven (179)

Hestehaven (183)

Hestehaven (182)

 Here’s a bunch of photos from the wall rebuilding process:
Hestehaven (189)

Hestehaven (190)

Hestehaven (191)

Hestehaven (198)

Hestehaven (201)

Hestehaven (202)

Hestehaven (203)

Hestehaven (205)

Then the kitchen gets installed.
Hestehaven (191)

Hestehaven (190)

Hestehaven (189)

We finished the top floor in the beginning of 2014, then took a break from the house project until October, before continuing in the basement, preparing the new workshop.
The plan was to connect two rooms, to make room for the fuselage and worktables. It would not be as large as my last garage, but it should do for finishing the fuselage.
First the ceiling came down.
Værksted (1)

Værksted (4)

Then the walls. Thank Bruno.. 🙂
Værksted (8)

Værksted (9)

Værksted (11)

When I tore down the top floor, I kept the fronts from the built in closets.
They should do fine in the workshop.
Værksted (12)

Værksted (13)

Værksted (16)

Værksted (17)

Værksted (19)

Værksted (21)

Værksted (22)

Værksted (23)

And finally the aircraft enters the workshop. 😀
Værksted (26)

Værksted (30)

Hacked by ghost-dz