July 18, 2008

Matchdrilling bottom skins

Category: 3: Wings (Total 309h) — Steffen @ 20:23 — Hours: 2

I matchdrilled all the bottom skins tonight. I have borrowed another 100 cleco’s from work, so I could attach all the skins at once. After the matchdrilling, I started attaching the fuel tank ribs. I am going to matchdrill the fuel tank skins to ribs and baffle next, then trace the holes from the skins to the leading edge attach strips. With that done, I can take off the leading edges and finish them. I still need to install my landing and taxi light kits in them as well. That should be fun!! 😉

Hacked by ghost-dz