December 29, 2007

Preparing vertical stab parts

Category: Vertical Stabilizer (Total 11h) — Steffen @ 17:51 — Hours: 4

Since I can’t get further with the horizontal stabilizer until I get my c-frame riveter, I desided to spend some time preparing the vertical stabilizer parts.

First I prepared the aft spar and reinforcement. Especially the reinforcerment needed a lot of edge smoothing. Then I clecoed it together and matchdrilled it.
vertical-stabilizer-002-400×300.jpg

After that I prepared the ribs. It went quite well, I am getting the routines down. 🙂
vertical-stabilizer-003-400×300.jpg

Then I clecoed the ribs and spars together and matchdrilled them as well.
vertical-stabilizer-004-400×533.jpg

Finally I could install the skin and matchdrill it to the understructure.
vertical-stabilizer-005-400×533.jpg

After matchdrilling the skin, I took it all apart again and deburred everything. I also dimpled and countersunk the lower part of the aft spar. Everything is ready for primer now. Maybe tomorrow! 😉
vertical-stabilizer-006-400×533.jpg