{"id":6265,"date":"2023-07-13T21:27:01","date_gmt":"2023-07-13T20:27:01","guid":{"rendered":"https:\/\/www.rv-7.dk\/?p=6265"},"modified":"2023-07-13T21:28:34","modified_gmt":"2023-07-13T20:28:34","slug":"final-assembly-2","status":"publish","type":"post","link":"https:\/\/www.rv-7.dk\/?p=6265","title":{"rendered":"Final assembly 2"},"content":{"rendered":"<p style=\"text-align: center;\">It&#8217;s been a very long day, but I managed to finish all the exterior wiring, and tested that all was working.<\/p>\n<p style=\"text-align: center;\">Here I am finishing the taxi light, strobe light and nav light wiring in the left wing.<a href=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-356-x1600-rotated.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6266\" src=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-356-x1600-768x1024.jpg\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-356-x1600-768x1024.jpg 768w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-356-x1600-1152x1536.jpg 1152w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-356-x1600-1536x2048.jpg 1536w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-356-x1600-676x901.jpg 676w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-356-x1600-rotated.jpg 1600w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">Left wing tip installed&#8230;<br \/>\n<a href=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-357-x1600.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6267\" src=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-357-x1600-768x576.jpg\" alt=\"\" width=\"768\" height=\"576\" srcset=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-357-x1600-768x576.jpg 768w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-357-x1600-2000x1500.jpg 2000w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-357-x1600-1536x1152.jpg 1536w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-357-x1600-2048x1536.jpg 2048w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-357-x1600-676x507.jpg 676w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">Strobe, nav and landing light wiring done in the right wing.<br \/>\n<a href=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-358-x1600.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6268\" src=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-358-x1600-768x576.jpg\" alt=\"\" width=\"768\" height=\"576\" srcset=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-358-x1600-768x576.jpg 768w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-358-x1600-2000x1500.jpg 2000w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-358-x1600-1536x1152.jpg 1536w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-358-x1600-2048x1536.jpg 2048w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-358-x1600-676x507.jpg 676w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">The wiring for the aileron autopilot servo took some time to complete.<br \/>\n<a href=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-359-x1600.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6269\" src=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-359-x1600-768x576.jpg\" alt=\"\" width=\"768\" height=\"576\" srcset=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-359-x1600-768x576.jpg 768w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-359-x1600-2000x1500.jpg 2000w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-359-x1600-1536x1152.jpg 1536w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-359-x1600-2048x1536.jpg 2048w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-359-x1600-676x507.jpg 676w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-360-x1600-rotated.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6270\" src=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-360-x1600-768x1024.jpg\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-360-x1600-768x1024.jpg 768w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-360-x1600-1152x1536.jpg 1152w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-360-x1600-1536x2048.jpg 1536w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-360-x1600-676x901.jpg 676w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-360-x1600-rotated.jpg 1600w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">I also finished the strobe unit wiring.<br \/>\n<a href=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-361-x1600-rotated.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6271\" src=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-361-x1600-768x1024.jpg\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-361-x1600-768x1024.jpg 768w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-361-x1600-1152x1536.jpg 1152w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-361-x1600-1536x2048.jpg 1536w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-361-x1600-676x901.jpg 676w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-361-x1600-rotated.jpg 1600w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<p style=\"text-align: center;\">The last thing to finish wiring, was the pitot heat.<br \/>\nAfter that, I reinstalled the instrument panel, and tested it all.<br \/>\nEverything was working, the only issue was the aileron trim, that was wired in opposite direction. swapping two wires in the aileron trim mixer fixed that problem.<\/p>\n<p style=\"text-align: center;\">Tomorrow I will start by installing the ailerons and flaps, then the engine controls.<br \/>\nHopefully I will be able to make the first engine start.. \ud83d\ude00<br \/>\n<a href=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-362-x1600.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6272\" src=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-362-x1600-768x576.jpg\" alt=\"\" width=\"768\" height=\"576\" srcset=\"https:\/\/www.rv-7.dk\/wp-content\/Finishing-362-x1600-768x576.jpg 768w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-362-x1600-2000x1500.jpg 2000w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-362-x1600-1536x1152.jpg 1536w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-362-x1600-2048x1536.jpg 2048w, https:\/\/www.rv-7.dk\/wp-content\/Finishing-362-x1600-676x507.jpg 676w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/p>\n<div class='watch-action'><div class='watch-position align-left'><div class='action-like'><a class='lbg-style3 like-6265 jlk' href='javascript:void(0)' data-task='like' data-post_id='6265' data-nonce='4c9e4b2286' rel='nofollow'><img class='wti-pixel' src='https:\/\/www.rv-7.dk\/wp-content\/plugins\/wti-like-post\/images\/pixel.gif' title='Like' \/><span class='lc-6265 lc'>+1<\/span><\/a><\/div><\/div> <div class='status-6265 status align-left'><\/div><\/div><div class='wti-clear'><\/div>","protected":false},"excerpt":{"rendered":"<p>It&#8217;s been a very long day, but I managed to finish all the exterior wiring, and tested that all was working. Here I am finishing the taxi light, strobe light and nav light wiring in the left wing. Left wing tip installed&#8230; Strobe, nav and landing light wiring done in the right wing. The wiring [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36],"tags":[],"class_list":["post-6265","post","type-post","status-publish","format-standard","hentry","category-finishing","post-preview"],"_links":{"self":[{"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=\/wp\/v2\/posts\/6265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6265"}],"version-history":[{"count":2,"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=\/wp\/v2\/posts\/6265\/revisions"}],"predecessor-version":[{"id":6274,"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=\/wp\/v2\/posts\/6265\/revisions\/6274"}],"wp:attachment":[{"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rv-7.dk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}