Besides cleaning up a bit in the garage – again!! – I worked a bit on the baggage bulkhead. First I marked and pilotdrilled the screw holes of the upper bulkhead.
![Fuselage 359 [800x]](http://www.rv-7.dk/wp-content/Fuselage-359-800x-400x300.jpg)
Also marked the notch where the shoulder harness cable will pass through..
![Fuselage 360 [800x]](http://www.rv-7.dk/wp-content/Fuselage-360-800x-400x300.jpg)
Then I taped the upper bulkhead in place, rechecked alignment and matchdrilled the screw holes to the F-706 bulkhead.
![Fuselage 361 [800x]](http://www.rv-7.dk/wp-content/Fuselage-361-800x-400x300.jpg)
I enlarged the holes to #30, so I could use cleco’s to install nutplates as drill guides.
![Fuselage 362 [800x]](http://www.rv-7.dk/wp-content/Fuselage-362-800x-400x300.jpg)
Here the upper nutplates are installed with cleco’s ready to drill.
![Fuselage 366 [800x]](http://www.rv-7.dk/wp-content/Fuselage-366-800x-400x300.jpg)
I installed the nutplates on the vertical bellcrank rib with a screw and spacer nut as guide..
![Fuselage 363 [800x]](http://www.rv-7.dk/wp-content/Fuselage-363-800x-400x533.jpg)
Rivet holes drilled. I countersunk these holes, but dimpled all the remaining rivet holes.
![Fuselage 364 [800x]](http://www.rv-7.dk/wp-content/Fuselage-364-800x-400x533.jpg)
Finally I installed all the bulkhead nutplates. I forgot to take a last photo before calling it quits..