I riveted the last two internal ribs in of the left tank tonight. It went very well and with that done, except for the riveting of the tank-to-fuselage brackets, the rest of the riveting will be done with the pneumatic squeezer. Great stuff!! ๐Ÿ˜€

The next thing I need to do, is make some ‘anti-hang-up guides’ for the fuel pick-up hoses. Also need to make the ventline and fuel-sender wiring. Can’t wait to finally do something else than mixing sealant and riveting ribs!!! ๐Ÿ˜‰ย The last thing I did tonight, was make this mock-up to get the size for the access panel ‘anti-hang-up guide’