I primed the longerons, the center section bulkhead sideplates and the aft canopy decks today at work.![Fuselage 190 [400x]](http://www.rv-7.dk/wp-content/Fuselage-190-400x.jpg)
Instead of starting out on the side skins, I desided to prepare the aft fuselage first. I deburred and dimpled the F-706 bulkhead rivet holes…
![Fuselage 191 [400x]](http://www.rv-7.dk/wp-content/Fuselage-191-400x.jpg)
Then all the aft fuselage holes. I flipped it to the sides for better access.
![Fuselage 192 [400x]](http://www.rv-7.dk/wp-content/Fuselage-192-400x.jpg)
Dimples!
![Fuselage 193 [400x]](http://www.rv-7.dk/wp-content/Fuselage-193-400x.jpg)
Finally I clecoed it back together. Thats all for tonight!
![Fuselage 194 [400x]](http://www.rv-7.dk/wp-content/Fuselage-194-400x.jpg)
Leave a Reply