I only had a few more things to make before moving the aircraft; the upper vertical stab attach bracket and horizontal stab shims.
I matchdrilled the bracket to the fuselage.

I also rearranged the shop, so I was ready to move the fuselage out through the window.

Friday I moved the empennage and flight controls to the airport.

Yesterday I finally moved the fuselage to the airport. Now it is time to install the empennage and wings.



Leave a Reply