I primed the gussets and bracket at work today. I did it in the morning, so the parts were dry enough to bring home after work.
![Fuselage 319 [800x]](http://www.rv-7.dk/wp-content/Fuselage-319-800x-400x300.jpg)
I made some final adjustments to the fuselage stand bracket too, now it fits perfect. All missing now is primer and paint…
![Fuselage 320 [800x]](http://www.rv-7.dk/wp-content/Fuselage-320-800x-400x533.jpg)
There was a few rivets missing in the aft fuselage, I decided to rivet those now, before riveting the aft deck.
![Fuselage 321 [800x]](http://www.rv-7.dk/wp-content/Fuselage-321-800x-400x300.jpg)
I clecoed the aft deck back on, but my elbow was a bit sore, so I decided to postpone the riveting for now.
![Fuselage 325 [800x]](http://www.rv-7.dk/wp-content/Fuselage-325-800x-400x300.jpg)
Instead I spent some time installing the F-695 Gussets; this was as far as my squeezer could reach.
![Fuselage 323 [800x]](http://www.rv-7.dk/wp-content/Fuselage-323-800x-400x300.jpg)
![Fuselage 322 [800x]](http://www.rv-7.dk/wp-content/Fuselage-322-800x-400x300.jpg)
![Fuselage 324 [800x]](http://www.rv-7.dk/wp-content/Fuselage-324-800x-400x300.jpg)
Leave a Reply